ERW Tube Mill Consultancy

ERW Tube Mill Engineering Services Proposal – MetaTechX Engineers LLP
MetaTechX Logo
Project & Technical Partnership With
Surya MFR
ERW Tube Mill Manufacturer

ERW Tube Mill

Erection, Commissioning & AMC for Lifecycle Support
Complete Engineering Services Proposal
MetaTechX Engineers LLP
Lucknow, Uttar Pradesh, Bharat

Project & Engineering Partner with Surya MFR Tube Mills Pvt Ltd
Sonipat, Haryana, Bharat

Since: 03 January 2024
Proposal No.: MX-ERW-PROJECT-2025
Validity: 30 Days from Date of Issue
MetaTechX Engineers LLP proposes comprehensive engineering services for your ERW Tube Mill project, covering complete erection, structured commissioning, operator training, and long-term annual maintenance support.

Project Objective

To ensure safe, efficient, and rapid commissioning of your ERW tube mill with stable production quality, minimal startup issues, and maximum operational efficiency.

Scope of Services

Erection Services

Complete mechanical, electrical, and process supervision with precision alignment and quality control throughout erection phase.

Commissioning Services

Structured dry → wet → trial → stabilization commissioning ensuring stable mill performance and product quality validation.

Training & Handover

Comprehensive operator and maintenance staff training with SOP documentation and troubleshooting guides.

Annual Maintenance Support

Long-term AMC covering periodic health audits, preventive maintenance, and breakdown support for sustained operational excellence.

Key Deliverables

  • Detailed erection plan with daily progress reports
  • Certified alignment and installation verification reports
  • Complete commissioning protocols and SOPs
  • Trial production report with quality metrics
  • Performance acceptance certificate
  • Operator & maintenance training modules
  • Annual health audit reports under AMC
  • Continuous process optimization recommendations

Why MetaTechX?

Proven Expertise

20+ years of steel industry experience with 30+ tube mill commissionings successfully executed

Fast Commissioning

Structured methodology achieves 30-40% faster commissioning than industry average

Quality Assured

SOP-driven operation ensures 85%+ quality specifications met in first month

MetaTechX Engineers will provide complete supervision and technical support for all erection activities of your ERW tube mill.

2.1 Pre-Erection Phase

Drawing Study & Planning

  • Detailed review of mechanical, electrical, and process drawings
  • Identification of critical erection sequences and dependencies
  • Review of equipment technical specifications and receiving inspection checklist
  • Preparation of erection master plan with detailed methodology

Site Readiness Assessment

  • Civil foundation verification (levels, squareness, load-bearing capacity)
  • Utility infrastructure audit (electrical supply, water, compressed air)
  • Safety compliance and work environment preparation
  • Identification of storage areas and crane/lifting requirements

2.5 Quality Checkpoints

CheckpointEquipment/SystemAcceptance Criteria
Foundation LevelingAll stands and baseframes±2 mm deviation tolerance
Roll AlignmentForming & sizing mill rolls±1 mm parallelism
Spindle RunoutForming mill spindles< 0.1 mm TIR
Drive SynchronizationMotor + gearbox + transmissionSmooth, vibration-free operation
Electrical SafetyAll electrical connectionsMegger > 10 MΩ resistance

Our commissioning follows a proven 4-phase methodology: Dry Run → Wet Commissioning → Trial Production → Performance Stabilization.

Phase 1: Dry Run Commissioning (Days 1-5)

Mechanical Verification

  • All mechanical systems checked for proper movement without load
  • Gearbox oil circulation and cooling system operation
  • Bearing temperature and vibration monitoring

Electrical Control Testing

  • PLC/DCS power-up and initial programming verification
  • Sensor functionality testing (pressure, temperature, speed)
  • Control logic dry run (no load movement)

Phase 4: Performance Stabilization (Days 21-25)

Final Optimization & Handover Preparation

  • Fine-tuning of weld parameters for consistent quality
  • Speed optimization for maximum TPH with quality assurance
  • SOP validation based on actual operating experience
  • Signing of commissioning completion certificate

Our team brings hands-on experience in commissioning high-speed ERW tube mills across various configurations and capacities. Below are representative images from similar tube mill commissioning projects:

Commissioning Capabilities

  • Round Tubes: up to 20″ OD (Automotive, general engineering, furniture applications)
  • Square/Rectangular: Various sections (Structural, construction, infrastructure use)
  • Production Rates: Up to 25 TPH (High-speed and heavy-duty mills)
  • Material Range: Mild steel, HSLA, stainless steel (Per IS1239 and customer specifications)
  • Quality Standards: ISO 9001 certification, stringent QA/QC processes

Successful mill operation depends on skilled operators and maintenance personnel. We provide comprehensive, hands-on training programs tailored to your team’s requirements.

5.1 Operator Training Program

Duration & Schedule

5-7 days of intensive on-the-job training during commissioning phase.

Training Modules

  • Mill Operation Fundamentals: How each system works, interrelationships, safety protocols
  • Control System Operation: PLC/DCS basics, panel operation, emergency procedures
  • Standard Operating Procedures (SOPs): Step-by-step normal operation, parameter adjustment
  • Quality Monitoring: How to measure OD, wall thickness, ovality acceptance criteria

5.3 Training Materials Provided

  • Operator Training Manual (20-30 pages with diagrams and photos)
  • Maintenance Training Manual (15-20 pages with maintenance schedules)
  • Standard Operating Procedures (SOP) Documents
  • Breakdown Diagnostic Flowcharts
  • Safety & Emergency Response Guide
  • Video recordings of key procedures for ongoing reference

Long-term partnership with MetaTechX ensures your tube mill operates at peak efficiency with minimal unplanned downtime and sustained productivity growth.

6.2 Annual AMC Timeline & Activities

QuarterFocus AreaKey ActivitiesDeliverables
Q1 (Jan-Mar)Post-Winter PerformanceHealth audit, lubrication system check, bearing inspection, motor efficiencyQ1 Health Report
Q2 (Apr-Jun)Mid-Year OptimizationAlignment verification, drive analysis, roll wear study, parameter reviewQ2 Optimization Report
Q3 (Jul-Sep)Peak Season SupportPreventive maintenance, cooling system verification, production ramp supportQ3 Performance Report
Q4 (Oct-Dec)Annual Assessment & PlanningComprehensive audit, year-end KPI review, planning for next yearAnnual Review + Next Year Plan

7.2 Cost Breakdown (Fixed-Price Model)

Cost HeadDescriptionEstimated Value (₹)Final Quoted Value (₹)
Engineering Services – ErectionSupervision, planning, alignment, daily reports (30-45 days on-site)5,50,0005,00,000
Engineering Services – CommissioningDry run, wet commissioning, trial production, parameter optimization (20-25 days)2,00,0001,50,000
Training & DocumentationOperator & maintenance training, SOP preparation, training materials (5 days)1,00,00050,000
Travel & AccommodationTravel, lodging, local transport (40 days × approx rate)1,00,00075,000
Documentation & ReportingEngineering reports, certificates, video documentation50,00025,000
TOTAL (Before Taxes)10,00,0008,00,000

7.3 Annual Maintenance Contract Pricing

AMC ModelAnnual Fee (₹)On-Site Days/YearEmergency Support
Basic Care (Model A)6,00,00012 days (3/quarter)Remote only
Comprehensive (Model B)9,00,00036 days (9/quarter)24-hour response
Excellence (Model C)18,00,000120 days (30/quarter avg)Dedicated engineer

7.4 Payment Schedule

MilestonePayment %Timing / Condition
Advance Payment60%Upon agreement signature and PO from customer
Progress Payment35%Upon completion of erection phase (before commissioning starts)
Final Payment5%Upon commissioning completion and performance acceptance by customer
AMC Payment100%After commissioning of project and AMC acceptance by customer

All payments to be made by cheque/bank transfer to MetaTechX Engineers LLP account. Invoice will be issued with GST as applicable.

8.1 General Conditions

Proposal Validity

This proposal is valid for 30 days from the date of issue. After 30 days, costs and team availability may change. Please confirm acceptance within this timeframe.

8.2 Confidentiality & Data Protection

MetaTechX Engineers LLP commits to maintaining strict confidentiality of:

  • Engineering designs, drawings, and technical specifications
  • Production parameters, process data, and performance metrics
  • Quality procedures, SOPs, and operational know-how
  • Commercial information and contractual details

All proprietary information is for project delivery purposes only and will not be shared with third parties without explicit written consent.

8.5 Force Majeure

MetaTechX is not liable for delays or failures caused by circumstances beyond our control, including natural disasters, pandemics, political instability, strikes, or customer-caused delays (incomplete site readiness, missing utilities, poor equipment condition).

How We Proceed After Your Approval

Step 1: Proposal Review & Discussion Days 1-3

You review this proposal and raise any questions or customization requests. We schedule a discussion call to finalize scope, timeline, and pricing.

Step 2: Statement of Work (SOW) Preparation Days 4-7

Based on discussion, we prepare a detailed SOW specifying scope, deliverables, timeline, and cost breakup. Both parties sign the SOW.

Step 3: Purchase Order & Advance Payment Days 8-10

You issue PO for agreed amount. We invoice 50% advance upon PO receipt. Payment processed, project mobilization begins.

Step 6: Erection Phase Days 21-40

Mechanical erection, electrical installation, alignment verification. Daily progress reports. First payment milestone (40%) due at erection completion.

Step 8: Handover & Final Payment Day 66

Commissioning completion certificate signed. Final 10% payment due. Transition to AMC support initiation.

Next Immediate Actions

  1. Review this proposal – Ensure scope aligns with your project needs
  2. Send feedback/clarifications – Any technical questions or customization requests
  3. Schedule discussion call – Let’s finalize details with your project team
  4. Issue Purchase Order – Once approved, PO initiation begins the engagement

Get In Touch – Let’s Make It Happen

Corporate Office MetaTechX Engineers LLP
Kolkata, West Bengal
India
Email support@metatechx.in
Phone +91 7323000303
+91 9676849859
WhatsApp: +91 7323000303
Online Website: www.metatechx.in
LinkedIn: metatechx-engineers

Our Commitment to You

“We don’t just commission tube mills. We build lasting partnerships that drive your success.”

Why Partner with MetaTechX?

  • Proven Track Record: 30+ successful tube mill commissionings
  • Expert Team: Hands-on metallurgical and engineering expertise
  • Quality Focus: Structured methodology ensuring stable production
  • Long-term Support: AMC services for sustained operational excellence

Ready to transform your ERW Tube Mill project?
Contact us today to discuss your requirements and explore how MetaTechX can be your trusted partner.

📧 Email us or call – Let’s get started!

MetaTechX Engineers LLP
Engineering Excellence Since 2016

In Technical Partnership with Surya MFR ERW Tube Mill

© 2025 MetaTechX Engineers LLP. All Rights Reserved. | Confidential & Proprietary

This proposal contains proprietary information intended exclusively for the addressed recipient. Unauthorized reproduction or distribution is prohibited.